Cargo & ULD build-up
Back to overview

Cargo & ULD build-up

Acceptance, screening, build-up, break-down, ULD control and warehouse handling for general, perishable, pharmaceutical and dangerous goods.

Cargo is accepted against the airway bill, screened, weighed and photographed before it enters the build-up area. Pallets and containers are built to the carrier's contour drawings, netted, tagged and staged in build order so the loading team never waits. Temperature-sensitive consignments move through a monitored cool chain with logged handovers.

Scope of work

  • Airway bill acceptance, screening and documentation
  • Contour-correct pallet and container build-up
  • Cool chain for perishables and pharmaceuticals
  • IATA-compliant dangerous goods segregation
  • ULD stock control, damage reporting and repair routing

Service commitments

  • Import breakdown completed within ninety minutes of offload
  • Export cut-off honoured with a documented late-acceptance path
  • Full traceability from acceptance to loading position